- Total building gut and renovation of 1971 building to create new high school.
- New classrooms on all floors.
- New cooking kitchen and cafeteria for student body.
- Reinforced existing roof structure to increase loading capacity and installed new roof deck with playground fence.
- Built new rooftop mechanical rooms and installed energy recovery ventilation system.
- Cleaned and repointed existing façade.
- Installed new windows, storefront and canopy.
- Complete new sprinkler system installed in previously non sprinklered building. Installation of new elevator with additional floor stop.
- New bathrooms and plumbing throughout all floors.
- New fire alarm system with public assembly space.