Search
Close this search box.

New Dawn Charter School

Project Sector: Education & Non-Profit

Project Highlights

  • Total building gut and renovation of 1971 building to create new high school.
  • New classrooms on all floors.
  • New cooking kitchen and cafeteria for student body.
  • Reinforced existing roof structure to increase loading capacity and installed new roof deck with playground fence.
  • Built new rooftop mechanical rooms and installed energy recovery ventilation system.
  • Cleaned and repointed existing façade.
  • Installed new windows, storefront and canopy.
  • Complete new sprinkler system installed in previously non sprinklered building. Installation of new elevator with additional floor stop.
  • New bathrooms and plumbing throughout all floors.
  • New fire alarm system with public assembly space.
Brooklyn

Our Education & Non-Profit Projects