Services Provided
Complete Studio Build-out of featured NBC studios/sound stages.
Project Highlights
View Details
Phased Construction with firm on-air deadlines.
High profile Studios, public access lobby, and production control rooms.
Major infrastructure alterations featuring existing steel beam alterations and cable raceways imbedded into the concrete floors all done on the floor above the Tonight Show without affecting the show.
Sophisticated finishes featuring Curved Glass control room viewing windows, high end leather, wood and metal walls/ceilings.
Managed Active Construction adjacent to occupied Production Control, Audio Control, and Music Mix rooms during live taping of shows.
Worked closely with NBCUniversal managing the public tour logistics through active construction zones with aesthetically pleasing and safe protection.
Coordinated sophisticated technical A\V systems closely with NBCUniversal.
Successfully managed construction logistics in the highly secure building while maintaining schedule deadlines.
Clearly communicated all construction activities with all Building Stakeholders on a daily basis.
30 Rockefeller Plaza
40,000
Design Republic